Case study
Full return of investment during 7 months of operation!
How OSM w Kole has cut their energy bills with Dween
I am not an expert of artificial intelligence, but I can see the results. The system works reliably, maintains a stable temperature, and allows us to save energy. I am glad we decided on this solution – it was a good decision.

Krzysztof Turlej
Head of the Technical Department at OSM Koło
Context
OSM w Kole is among the biggest milk processing establishments in Poland with a strong position in milk powder, sourcream and butter production.
Production is reliant on huge supply of iced water.
Problem
Refrigeration system operates under constant set-points, producing ice during the night and decreasing operation power during electricity peak times.
Refrigeration system does not adopt to varying production loads or ambient conditions
Solution
Automated intelligent control enabled stable and efficient operation of refrigeration system, stabilized iced water supply temperature, reduced overal load of the system and electricity consumption
Technical details
Machinery room
CompressorsJCi Sabroe 151
ControllersJci Unisab III
Electric capacity4x160kW
Refrigeration capacity4x600kW
Ammonia tank
Ammonia8t
Min. temperature-8°C
Iced water tanks
Water capacity2x70t
Storage capacity8x3.7MW
Digital twin
Continuous monitoring
Compressor station load and status
Electricity consumption
Refrigeration energy consumption
Autonomous control:
-Iced water supply temperature
-Ammonia level
-Heat exchanger
Promise to achieve ROI in 12 months, delivered in:
Set up time without ceasing operations
4
months
Results
3.5%↑
Production increase
-8%↓
Ellectricity consumption reduction in Y2025
232 MWh
Reduction of electric energy consumption during first year of operation (2024.09-2025.08)