DWEEN runs the plan
and runs the plant
DWEEN is a digital twin platform for energy-intensive industries, delivered as two working systems: an MES that records what happens on the floor, and an APS that decides what should happen next.
Manufacturing
Execution System
An MES is the layer between the control system and the business system. It knows every order on the floor in real time: which line is running it, which materials went in, how long it took, what came out, and where it stopped. Where ERP records intent and SCADA records signals, the MES records production as it actually happened.
Advanced Planning
and Scheduling
An APS decides what to make, when, and on which resource. It schedules against finite capacity and real constraints at once: machine availability, changeover times, material arrivals, labour, and energy tariffs. The output is a sequence the plant can actually run, and a delivery date the sales team can commit to.
What an MES does
Six functions cover most of what plants ask an MES for. DWEEN ships them against the same data model the digital twin uses, so nothing is entered twice.
Production tracking
Every order followed from release to completion, with quantities, timestamps, and the resource that ran it recorded automatically.
OEE and downtime
Availability, performance, and quality calculated from machine signals, with stops attributed to a reason code rather than a guess.
Traceability
Full genealogy from raw material lot to finished unit. Recall scope is a query, not an investigation.
Quality management
In-process checks, tolerance limits, and non-conformance handling recorded against the order that produced them.
Resource and labour
Who and what was assigned to each operation, including certifications, tooling, and shift coverage.
Energy per order
Consumption measured at the process and allocated to the production order, which is where cost decisions are made.
Execution data is the input every efficiency programme needs and most plants do not have.
Downtime attributed to a cause rather than a shift. Yield traced to a batch rather than a month. Energy consumption tied to the order that consumed it. Once the MES is recording it, the twin can model it.
What an APS does
Planning stops being a spreadsheet exercise once capacity, changeovers, and material availability are solved together instead of one after another.
Finite capacity scheduling
Sequencing against real machine availability instead of infinite capacity assumptions, so the plan is executable on the day it is issued.
Changeover optimisation
Orders grouped and sequenced against a changeover matrix to cut setup time and material loss between runs.
Material and supply sync
The schedule respects what has actually arrived and what is confirmed to arrive, not the theoretical bill of materials.
What-if scenarios
Simulate a rush order, a breakdown, or a shift change and see the delivery impact before committing to it.
Delivery date commitment
Capable-to-promise dates derived from the live schedule, so sales quotes reflect the plant rather than a lead-time table.
OEE-aware sequencing
Heavy loads moved toward cheaper tariff windows and away from peak demand charges wherever the process allows.
A schedule that respects the constraints is worth more than a schedule that hits the target on paper.
Shorter changeover time, less work in progress, fewer expedited orders, and energy-aware sequencing that moves the heaviest loads away from peak tariffs. The plan is re-solved when reality moves, not once a week.
One system, closed around the digital twin
Most plants buy MES and APS separately and spend the first year making them talk. DWEEN delivers both on one model of the process, so the plan is built from measured behaviour and measured behaviour corrects the plan.
Model
The digital twin describes how the process behaves, calibrated against historical operation.
Plan
The APS solves the schedule against the twin, so the sequence reflects real process behaviour.
Execute
The MES issues the work, tracks it live, and records what was actually produced and consumed.
Correct
Measured deviation re-calibrates the twin and re-solves the plan. The loop runs continuously.
Where each one sits
Start with the process you already know is costing you
Connect one line, run it for a month, and compare the schedule the APS produces against the one you run today. No bespoke engineering project to get there.